Who’s Responsible for Field Measurements — and When?
Who’s responsible for field measurements on a custom cabinet job — and when they happen — so nothing arrives the wrong size.
[robo-gallery id=”6222″]
Who’s responsible for field measurements on a custom cabinet job — and when they happen — so nothing arrives the wrong size.
What a normal deposit and payment schedule looks like for custom cabinets, and how to tell a fair structure from a risky one.
What really happens to your deposit if a cabinet shop goes under — and how a true manufacturer protects the money you put down.
Who actually installs your custom cabinets — our own crew, or a subcontractor? Why one team from bench to wall keeps the reveals tight.
Where custom cabinetry fits in a Boca Raton kitchen remodel, and why engineering it first keeps every other trade on schedule.
What separates a real cabinet manufacturer from a reseller — designed, engineered, built, and installed under one roof in Boca Raton.
Flush-build or standard — the one appliance-spec decision, made before the first drawing, that separates integrated from bolted-on.
Yes — by appointment, with a vest and goggles. What you’ll see on a working factory floor, and why most people who walk it become clients.
8 to 14 weeks is the honest number — and the four-week quote is usually the red flag. Why the timeline is what it is, and what to ask before you sign anywhere.
Semi-custom can match your dimensions. It cannot give you the kitchen exactly your way. The honest difference, and the questions that expose any quote.